Electrical Infrastructure

Substation + HV Line Cherry Lake

Mie, Japan

Project description

The Cherry Lake photovoltaic plant was built in Mie Prefecture (Japan) in November 2018. With a voltage of 70 MVA 154/22 kV, it is considered one of the most relevant projects for MAETEL, as it achieves the highest installed power of 98 MW.