Electrical Infrastructure

Section A – Pondview 132 kV Cables

United Arab Emirates

Project description

132 kV cable laying works for the Pondview 132/11 kV Substation.

The 132kV Cable Laying Works for POND VIEW (PONDVIEW) 132/11kV Substation comprised the supply, installation, testing, commissioning, and energization of new 132kV XLPE underground cable circuits to establish power transmission connections between the new PONDVIEW Substation and the existing CAR COMPLEX (CARX) and NAD AL SHIBA RESIDENTIAL (NSHR) substations. The works included laying two groups of 132kV XLPE cable circuits, over an approximate route length of 3.0 km between PONDVIEW and CARX and 5.0 km between PONDVIEW and NSHR.