Renewable Energy
PV Cluster Terrer. 133 MW
Zaragoza, Spain
Project description
Construction of three photovoltaic plants in Zaragoza with a total installed capacity of 133.05 MWp.
Construction of three photovoltaic plants — TERRER (41.12 MWp), BILBILIS (41.53 MWp) and DULCENOA (50.40 MWp) — with a total installed capacity of 133.05 MWp. The scope includes engineering, permitting, procurement of materials and equipment, and balance of plant (BOP) construction, excluding the step-up substation (SET) and high-voltage (HV) line.