Industrial Solutions & Maintenance
Pikolin Installations
Zaragoza, Spain
Project description
For the new PIKOLIN bedding products manufacturing plant between 2016 and 2018, MAETEL is assembling the new production lines:
Foam processing and cutting machines,
Bridges – Crane,
Metal structures,
Chemical deposits,
Storage shelves.
For the new logistics warehouse in PIKOLIN, which has a total area of 32,000 m2, MAETEL is installing PCI systems (Fire Protection):
Fire hydrant networks, BIE (Equipped Fire Hydrant) and sprinklers,
Aspiration detection,
Control of fumes and temperatures by barriers.