Full EPC Conversion of La Pereda Thermal Power Plant Installations to Biomass and Waste Fuel

Asturias, Spain

Project description

Modify the fuel used at the Plant, which currently consumes coal, replacing it with biomass and refuse-derived fuel (RDF), while maintaining its gross capacity of 50 MW and complying with all applicable environmental regulations.

Carrying out a series of modifications to the boiler, the flue-gas treatment system, the cooling system, and the fuel yard.

The scope of supply includes all conceptual, basic, and detailed engineering, procurement, manufacturing, transportation, civil works, electromechanical erection, programming, commissioning, and final testing.