Renewable Energy
BOP Construction (Civil & Electrical) of the El Puerto Wind Farm (25 MW)
Teruel, Spain
Project description
BOP (Balance of Plant) Construction for the 25 MW El Puerto Wind Farm. Civil Works (access roads, internal roads, earthwork, drainage, crane pads, WTG foundations, cable trenching). MV Electrical Installation. Fiber Optic cable laying. Evacuation Infrastructure.