Electrical Infrastructure

Reinforcement of Rafea & Wadi Summan Area Substations

Rafeah, Saudi Arabia

Project description

115kV HV Gas Insulated Switchgear (5 bays)
50/67 MVA Power Transformer (SEC Supply) (2 nos)
13.8kV Switchgear (23 nos)
13.8kV 20 MVAR outdoor containerized STATCOM (1 nos)
Associated Protection System
Substation Automation System & Communication System
Associated Building.
Testing & Commissioning.