Electrical Infrastructure

Substation + HV Line Arcelor Mittal

Zaragoza, Spain

Project description

Substation and High Voltage Power Line for Arcelor Mittal factory (Spain). Extension of “SET Arcelor”, for the installation of a new 45/6.3 kV, 15 MVA transformer,
Replacement of terminals and cables of system distribution networks,
220/45/33 kV transformer substation, equipped with 60 MVA 220/45 kV and 110 MVA 220/33 kV transformers.