Electrical Infrastructure

Cable Replacement at Safaniyah

Safaniyah, Saudi Arabia

Project description

115 kV power cable replacement works at Safaniyah for Saudi Aramco.

115kV XLPE Power Cable from Substation 01 to Substation 20 of 5km’s (Double Circuit).
Installation of Insulated Joints, Link boxes and Terminations.
Extension of 1 bay at SS 1.
GIB Modification Works at SS 20.
Associated Protection & SAS modification Works.