PV Cherry Lake. 98 MW (JAPAN)
The photovoltaic plant of Cherry Lake was built in the prefecture of Mie (Japan) in November of the year 2018.
The photovoltaic plant of Cherry Lake was built in the prefecture of Mie (Japan) in November of the year 2018. It is consider one of the most relevant projects for MAETEL, since it reaches the highest power of installed power, 98 MW.
- Date of grid Nov/2018
- Type of project EPC Complete
- Substation and lenght of the line Switching Station 154 kV + 3,7 km underground line 154 kV + 0,5 km Overhead line 154 kV + Substation PV Plant 70 MVA 154/22 kV