Industrial Installations and Maintenance Pikolin Installations (SPAIN)

Pikolin Installations (SPAIN)

For the new PIKOLIN bedding products manufacturing plant between 2016 and 2018, MAETEL is assembling the new production lines:

  • Foam processing and cutting machines,
  • Bridges - Crane,
  • Metal structures,
  • Chemical deposits,
  • Storage shelves.

For the new logistics warehouse in PIKOLIN, which has a total area of 32,000 m2, MAETEL is installing PCI systems (Fire Protection):

  • Fire hydrant networks, BIE (Equipped Fire Hydrant) and sprinklers,
  • Aspiration detection,
  • Control of fumes and temperatures by barriers.