Asea Brown Boveri Installations (SPAIN)
For the refurbishment of the ACERINOX factory in Algeciras (Cadiz) in 2017, MAETEL is carrying out the assembly work of the 2.5 MW winding motors.
Asea Brown Boveri Installations (SPAIN)
For the refurbishment of the ACERINOX factory in Algeciras (Cadiz) in 2017, MAETEL is carrying out the assembly work of the 2.5 MW winding motors.